¾¯Ê¾´ø·óÉèÇ°Ó¦¶Ô·óÉèÃæѹʵ£¬È»ºó½«ÆäƽÕûµÄ·óÉèÔڹܵÀµÄÕýÉÏ·½£¬¾à¹Ü¶¥µÄ¾àÀëÒËΪ0.3~0.5Ã×£¬µ«²»µÃÂñÈë·»ùºÍ·ÃæÀï ¡£

Before laying the warning tape, the laying surface should be compacted, and then it should be laid flat directly above the pipeline. The distance from the top of the pipeline should be 0.3-0.5 meters, but it should not be buried in the roadbed and road surface.

¾¯Ê¾´øµÄÄÚÈݱØÐè°üÀ¨£º×°±¸È¨Êôµ¥Î»Ãû³Æ¡¢Î£ÏÕ±ê¼Ç¡¢¾¯Ê¾ÓÃÓï¡¢ÁªÏµµç»°¡¢Éè¼ÆѹÁ¦Æ·¼¶ ¡£

The content of the warning tape must include: the name of the equipment ownership unit, danger signs, warning language, contact phone number, and design pressure level.

ʾ×ÙÏß

Tracer line

¾ÛÒÒϩȼÆø¹ÜµÀ·óÉèʱ£¬Ó¦Ôڹܶ¥Í¬Ê±Ëæ¹ÜµÀ×ßÏò·óÉèʾ×ÙÏß ¡£Ê¾×ÙÏßÒ˽ÓÄÉ2¡Á2.5mm2 Ë«Ïßµ¥Ð¾Í­Ïߣ¬ÍâÓоøÔµÓÅÒìµÄ±£»¤²ã ¡£Ê¾×ÙÏßÓ¦ÓÐÓÃÅþÁ¬£¬ÔÚÍ­ÏßÌÖÂÛ´¦Ò˽ÓÄÉË«Ïß¾À¸ðÎýº¸¹¤ÒÕ£¬°ü¹Üµ¼µçÐÔÄÜ ¡£Íâ¾øÔµ´¦Óýº´ø°üÔú£¬²¢ÓÃÈÈËõ¶ÌÌ×·â¹Ì£¬·â¹Ì³¦¶Ç±ØÐè´óÓÚ½º´ø°üÔú¶Ë20mm.ÑؾÛÒÒϩȼÆø¹ÜµÀ×ßÏòÿ¸ô2kmÓ¦ÉèÐźÅÔ´¾® ¡£¼ì²é¾®µÈÉèÊ©¿É×÷ΪÐźÅÔ´¾® ¡£ÐźÅÔ´¾®ÄÚÓÖÐźÅÌÖÂÛ£¬ÓÃÓÚ½Ó²µÊ¾×ÙÏߵIJâÊÔÍâ½ÓÐźÅ ¡£ µç×Ó±êʶÆ÷  ȼÆø¹ÜµÀÒËÉèÖõç×Ó±êʶÆ÷ ¡£µç×Ó±êʶÆ÷ÄÚ´æ¿É°üÀ¨¹ÜµÀȨÊôµ¥Î»Ãû³Æ¡¢¹ÜµÀ¿Ú¾¶¡¢×°ÖûòάÐÞÈÕÆÚ¡¢Ñ¹Á¦¼¶ÖÆ¡¢ Ê©¹¤µ¥Î»Ãû³Æ¡¢µç×Ó±êʶÆ÷Óë¹ÜµÀµÄÏà¶ÔλÖõÈ ¡£

When laying polyethylene gas pipelines, tracer lines should be laid at the top of the pipeline along with the direction of the pipeline. The tracer line should use 2 ¡Á 2.5mm2 double wire single core copper wire with a well insulated protective layer on the outside. The tracer wire should be effectively connected, and the double wire winding soldering process should be used at the copper wire joint to ensure conductivity. Wrap the external insulation with tape and seal it with a heat shrink sleeve. The sealing end must be 20mm larger than the tape wrapping end. Signal source wells should be installed every 2km along the direction of the polyethylene gas pipeline. Inspection wells and other facilities can serve as signal source wells. There is a signal connector inside the signal source well, which is used to connect external signals for testing tracer lines. Electronic markers should be installed on gas pipelines. The memory of the electronic identifier can include the name of the pipeline ownership unit, pipeline diameter, installation or maintenance date, pressure rating system, name of the construction unit, and the relative position of the electronic identifier with the pipeline.

µç×Ó±êʶÆ÷ӦװÖÃÔÚÒÔÏÂλÖãº

Electronic markers should be installed in the following locations:

·§ÃÅ¡¢Ë®¾®¡¢ÎþÉüÑô¼«µÈ¹ÜµÀÁ¥ÊôÉèÊ©µã ¡£

Valves, water wells, sacrificial anodes, and other pipeline ancillary facilities.

¹ÜµÀתÍä´¦¡¢¹ÜµÀÈýͨ¡¢ËÄͨ´¦ ¡£

At pipe bends, tees, and tees.

ÆäËûÈËΪÖ÷Òª¶øÐèÒª±ê×¢µÄλÖà ¡£

Other important positions that need to be marked.

ÎÞÉÏÊö×°ÖõãµÄµØÏÂȼÆø¹ÜµÀµÄÖ±Ï߶εç×Ó±êʶÆ÷ÂñÉè¼ä¾àӦΪ100Ã× ¡£  ά»¤ÖÎÀí

20220923112016525.jpg

The buried spacing of electronic markers for straight sections of underground gas pipelines without the above installation points should be 100 meters. maintenance management

±êʶӦ·ÖÀà±àºÅ²¢¹ÒºÅÈëµµ ¡£

The identification should be classified, numbered, and registered in the file.

н¨¹ÜµÀ¼°ÉèÊ©±êʶӦÓëÖ÷Ì幤³ÌͬʱÉè¼Æ¡¢Ê©¹¤¡¢ÑéÊÕ²¢½»¸¶Ê¹Óà ¡£

The identification of newly constructed pipelines and facilities should be designed, constructed, inspected, and delivered for use simultaneously with the main project.

Òѽ¨¹ÜµÀ¡¢ÉèÊ©¼°ÇéÐα¬·¢×ª±äʱ£¬Ó¦ÊµÊ±Ôö¼õ»ò±ä»»±êʶ ¡£

When there are changes in the existing pipelines, facilities, and environment, the identification should be promptly added, removed, or changed.

±êʶȨÊôµ¥Î»Ó¦°´¹ÜµÀѲ¼ìÖÜÆÚͬ²½Ñ²²é£¬°ü¹Ü±êʶÍêºÃ ¡£±êʶɥʧ¡¢Ëð»µÊ±£¬Ó¦ÊµÊ±´¦Àí ¡£

The identification ownership unit should conduct synchronous inspections according to the pipeline inspection cycle to ensure that the identification is intact. When the identification is lost or damaged, it should be disposed of in a timely manner.

±êʶÄÚÈÝÓ¦ÇåÎú ¡£ÒËÁ½ÄêË¢ÆáÒ»´Î ¡£

The identification content should be clear. It is recommended to paint once every two years.

±¾¹æ³ÌÓôË˵Ã÷

This regulation uses this explanation

Ϊ±ãÓÚÔÚÖ´Ðб¾¹æ³ÌÌõÎÄʱÇø±ð¿´´ý£¬¶ÔÒªÇóÑÏ¿áˮƽ²î±ðµÄÓôË˵Ã÷ÈçÏ£º

In order to facilitate differential treatment when implementing the provisions of this regulation, this explanation is used for those with different levels of strictness:

¢Å  ÌåÏÖºÜÑϿᣬ·ÇÕâÑù×ö²»¿ÉµÄÓôʣº ÕýÃæ´Ê½ÓÄÉ¡°±ØÐ衱 ±³Ãæ´Ê½ÓÄÉ¡°ÑϽû¡± ¡£

(1) Words that indicate strictness and must not be used: positive words use "must" and negative words use "strictly prohibited".

¢Æ  ÌåÏÖÑϿᣬÔÚÕý³£ÇéÐÎϾùÕâÑù×öµÄÓôʣºÕýÃæ´Ê½ÓÄÉ¡°Ó¦¡±±³Ãæ´Ê½ÓÄÉ¡°²»Ó¦»ò¡°²»µÃ¡±

(2) Words that indicate strictness and should be used under normal circumstances: positive words use "should", negative words use "should not" or "should not"

¢Ç  ÌåÏÖÔÊÐíÉÔÓÐÑ¡Ôñ£¬ÔÚÌõ¼þÔÊÐíʱӦÕâÑù×öµÄÓôʣºÕýÃæ´Ê½ÓÄÉ¡°ÒË¡±»ò¡°Ò»Ñùƽ³£¡±±³Ãæ´Ê½ÓÄÉ¡°²»ÒË¡± ¡£ÌåÏÖÓÐÑ¡Ôñ£¬ÔÚÒ»¶¨Ìõ¼þÏ¿ÉÒÔÕâÑù×öµÄ£¬½ÓÄÉ¡°¿É¡± ¡£

(3) Words that allow for slight choices should be used first when conditions permit: positive words should be "appropriate" or "general", while negative words should be "inappropriate". It indicates that there is a choice and can be done under certain conditions, using "may".