Yp街机电子游戏

½Ó´ýÀ´µ½Yp街机电子游戏ÍøÕ¾ £¬ÎÒÃǽ߳ÏΪÄúЧÀÍ

Ä¿½ñλÖãºÊ×Ò³-×ÊѶÖÐÐÄ>¹«Ë¾ÐÂÎŵØÂñ¾¯Ê¾×®ÔõôÂñ

µØÂñ¾¯Ê¾×®ÔõôÂñ

ȪԴ£º/ Ðû²¼Ê±¼ä£ºÈÕÆÚ£º2022-07-27 0´Î
µØÂñ¾¯Ê¾×®Ê¹ÓÃʱ´ú²»ÐèÒª²ÙÐÄά»¤ £¬ÉÐÓÐÒ»¸ö½ÏÁ¿Ö÷ÒªµÄ·½Ãæ¾ÍÊÇËü¾ßÓкܺõķÀµÁÐÔ £¬ËüÊÇÒ»´ÎÐÔ³ÉÐÍ £¬¸üºÃµÄ°ü¹ÜÁËËüÔÚʹÓÃʱ´úÄܹ»¸üºÃµÄÊ©Õ¹×÷Óà ¡£ÄÇôµØÂñ¾¯Ê¾×®ÔõôÂñ£¿
There is no need to worry about maintenance during the use of the buried warning pile. Another important aspect is that it has good anti-theft property. It is formed at one time, which better ensures that it can play a better role during the use. So how to bury the warning pile?
1.Ä£¾ßÖÆ×÷ ¡£ ʾ¾¯×®Ä£¾ß½ÓÄÉÔ²¸Ö¼Ó¹¤ÖÆ×÷,·Ö×óÓÒÁ½°ë,²¢ÇÒÉÏÃ溸Óнô¹ÌÂÝ˨,ÒÔ±ÜÃâÆä Õñµ·ÕÅ¿ª,Ó°ÏìÆä³ß´ç ¡£
1. Mold making. The warning pile mold is made of round steel, divided into left and right halves, and is welded with fastening bolts to prevent its vibration from opening and affecting its size.
2.ʾ¾¯×®Ô¤ÖÆ  ¡£Ô¤ÖƽÓÄɼ¯ÖÐÔ¤ÖÆ,°´Éè¼ÆÒªÇó,ÏȽ½Öþ± £»¤²ãÔÙ·ÅÈëÔ¤ÖƺõÄÅä½î,ÔÙ½ÓÄɷֲ㽽Öþ,ÓÃÕñµ·Æ÷µ·ÃÜʵºó½½ÖþµÚ¶þ²ã,´ý½½ÖþºóµÖ´ïÄý¹ÌÇ¿¶Èºó,·­¿ªÄ£¾ß,½«ÆäÍâò²øÁýÕÖ±¡Ä¤¾ÙÐÐÑøÉú ¡£
2. Warning pile prefabrication. The prefabrication adopts centralized prefabrication. According to the design requirements, the protective layer is poured first, then the prefabricated reinforcement is placed, and then the layered pouring is adopted. The second layer is poured after being compacted with a vibrator. After the pouring reaches the solidification strength, the mold is opened, and its surface is wrapped with a film for curing.
3.ʾ¾¯×®»ù´¡¿ªÍÚ  ¡£Ê¾¾¯×®Ê©¹¤¹¤¾ßÁ÷¶¯ÐÔ´ó,ËöмµÄÌصã,»ù´¡½ÓÄÉÈ˹¤¿ªÍÚ,²¢½«µ×²¿Õûѹʵ ¡£
3. Warning pile foundation excavation. Warning pile construction tools have the characteristics of large fluidity and fragmentation. The foundation is excavated manually and the bottom is compacted.
µØÂñ¾¯Ê¾×®
4.ÅçÍ¿·¢¹âÆá  ¡£ÑϿᰴͼֽҪÇóµÄÑÕÉ«¡¢¼ä¾àÍ¿Ë¢·¢¹âÆá ¡£
4. Spray luminous paint. Apply luminous paint in strict accordance with the color and spacing required by the drawing.
±ðµÄ¿ª¹¤Ç°ÒªÐÐÔ°µØÕûÀí £¬°üÀ¨¿ªÍÚÇøµÄÀ¬»ø¡¢ÔӲݡ¢²»¿ÉʹÓõıíÍÁ¼°ÆäÕÏ°­Îï £¬Ó¦¶ÔÕÉÁ¿¿ØÖƵ㼰·ÅÏßλÖþÙÐÐУºË ¡£¿ªÍÚ±ßÏßÓ¦ÓÐ×ã¹»ÊýÄ¿µÄµØÂñ¾¯Ê¾×® ¡£²¢Òª×¢ÖرÜÃâÒÆλ¡¢Ë𻵠£¬Ê©¹¤·½ÐèÔ¼Çë´åίºÍȺÖÚ´ú±íһͬ¼ÓÈë·ÅÏßÊÂÇé ¡£×èÖ¹±¬·¢²»ÐëÒªµÄì¶Ü £¬°ü¹Ü¹¤³Ì¿ª¹¤Ë³Ëì¾ÙÐÐ ¡£
In addition, the site shall be cleared before construction, including garbage, weeds, unusable topsoil and obstacles in the excavation area. The measurement control points and setting out positions shall be checked. The excavation sideline shall have a sufficient number of buried warning piles. Attention should also be paid to prevent displacement and damage. The construction party should invite the village committee and mass representatives to participate in the setting out work. Avoid unnecessary contradictions and ensure the smooth commencement of the project.
¿ªÍÚ»ù´¡µÄÉî¶ÈºÍ¿í¶ÈÒªÇкϰ´Éè¼ÆÒªÇó ¡£ÈôÓÐÒì³£Õ÷ÏóӦʵʱÏò¼àÀí¡¢ÒµÖ÷»ã±¨ £¬´ý×öÀ´ÓÉÖþöÒéºóÔÙ¼ÌÐøÊ©¹¤ ¡ £»ØÌîÍÁҪƾ֤ҪÇó¾ÙÐлØÌî £¬²»È»Ò»Âɲ»ÓèÑéÊÕ ¡£
The depth and width of the excavated foundation shall meet the design requirements. If there is any abnormal phenomenon, it should be reported to the supervisor and the owner in time, and the construction can be continued after the decision is made. The backfill shall be backfilled as required, otherwise it will not be accepted.
µØÂñ¾¯Ê¾×®ÔõôÂñ£¿ÒÔÉϾÍÊÇÎÊÌâµÄÏà¹Ø½â´ðÁË £¬ÈôÊÇÄú¶Ô´Ë¸ÐÐËȤ»òÕßÓÐÐèÇóÒª¹ºÖà £¬¾Í¹Ø×¢ÍøÕ¾ÁªÏµYp街机电子游戏×Éѯ°É ¡£
How to bury the warning pile? The above is the relevant answer to the question. If you are interested or need to buy, please follow the website Contact us for advice.

Ïà¹Ø²úÆ· / Related products

  • µØ¶¤

    µØ¶¤

  • µØ¶¤

    µØ¶¤

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

  • ¾¯Ê¾×®

    ¾¯Ê¾×®

½ØÆÁ £¬Î¢ÐÅʶ±ð¶þάÂë

sitemap¡¢ÍøÕ¾µØͼ